Power transformers, Q1 2025: Wood Mackenzie

Wood Mackenzie's lead time benchmark put average power transformer lead times at 138.4 weeks in 2025 Q1.

138.4 weeks Large power · Q1 2025 · US

“Chart value 138.4 weeks (2025-Q1); see page 5 of the executive summary.”
Class on the chart
Large power and substation transformers
Transformer type
Power transformer
Size / class
Power transformer (classified by type, not voltage)
Region
US
As of
2025-Q1
Lead time, low (weeks)
138.4
Lead time, high (weeks)
138.4
Lead time as stated
Average 138.4 weeks after receipt of order (chart value). Source: Wood Mackenzie Supply Chain’s Lead Time Benchmarking (chart 'Quarterly lead time change 2025 Q1 – 2025 Q2', weeks ARO).
Publisher
Wood Mackenzie
Source type
primary
Verified

Sources

  1. Wood Mackenzie: Making the connection: meeting the electric T&D supply chain challenge, Executive Summary, September 2025 (with American Clean Power) accessed 2026-11-09

Cite this reading

Wood Mackenzie, as compiled by Transformer Lead Times: “Power transformers, Q1 2025: Wood Mackenzie”. https://transformerleadtimes.com/woodmac-power-2025q1/ (accessed 9 Nov 2026).

CC BY 4.0. Quote the original publisher; link this page for the dated record.

Other large power readings

Filter the table
As ofReadingPublisher
Aug 2026 160+ weeks Power / substation transformer VAWN (aggregating Wood Mackenzie)
Jul 2026 Pushing past three years Large substation transformer Reuters (Roseville Electric CEO Dan Beans)
May 2026 +80% High-capacity power transformer PwC analysts (via pv magazine, citing Reuters Events)
May 2026 +80% Large power transformer National Laboratory of the Rockies (formerly NREL), US DOE
May 2026 200+ weeks Large power transformer Transformer Technology (citing Northfield Transformers)
Feb 2026 +79% Large power transformer BloombergNEF (via pv magazine)
Q2 2025 128 weeks Power transformer Wood Mackenzie
Feb 2025 Three to six years Transmission-scale power transformer Hitachi Energy (via Utility Dive)