Power transformer transformer prices, Jan 2023 to Mar 2025: Wood Mackenzie

Wood Mackenzie's price index shows power transformer transformer prices up 15% from January 2023 to March 2025.

+15% Prices · Mar 2025 · US

“Transformer Price Change by Specification January 2023 – March 2025 ... Pad Mount 1 Phase (+18%) Pad Mount 3 Phase (+20%) Pole Top (+21%) Power Transformer (+15%) Substation Transformers (8%)”
Class on the chart
Price indexes and price changes
Transformer type
Power transformer
Size / class
Power transformer
Region
US
As of
2025-03
Price change
15%
Price baseline
vs January 2023 (index Jan 23 = 100)
Publisher
Wood Mackenzie
Source type
primary
Verified

Sources

  1. Wood Mackenzie: Making the connection: meeting the electric T&D supply chain challenge, Executive Summary, September 2025 (with American Clean Power) accessed 2026-11-09

Cite this reading

Wood Mackenzie, as compiled by Transformer Lead Times: “Power transformer transformer prices, Jan 2023 to Mar 2025: Wood Mackenzie”. https://transformerleadtimes.com/woodmac-price-power-2023-2025/ (accessed 9 Nov 2026).

CC BY 4.0. Quote the original publisher; link this page for the dated record.

Other prices readings

Filter the table
As ofReadingPublisher
Sep 2026 +85.9% Electric power and specialty transformers (industry PPI) US Bureau of Labor Statistics (via FRED)
Jan 2026 +78.4% Electric power and specialty transformers (industry PPI) US Bureau of Labor Statistics (via FRED)
Mar 2025 +21% Pole-mounted distribution transformer Wood Mackenzie
Mar 2025 +18% Pad-mount single-phase distribution transformer Wood Mackenzie
Mar 2025 +8% Substation transformer Wood Mackenzie
Mar 2025 +20% Pad-mount three-phase distribution transformer Wood Mackenzie
Jan 2025 +69.6% Electric power and specialty transformers (industry PPI) US Bureau of Labor Statistics (via FRED)
2025 up to +95% Distribution transformer Wood Mackenzie (via POWER)